Service & Quality Control

Ensuring excellence and precision at every stage of our manufacturing process. We implement strict quality management systems to deliver reliable filtration solutions to our global partners.

Strict Quality Control System

1

IQC (Incoming Quality Control)

Rigorous inspection of all raw materials, including filter media, adhesives, and frames, ensuring they meet structural and environmental standards before entering production.

2

IPQC (In-Process Quality Control)

Continuous monitoring during the pleating, assembling, and gluing processes. Supervisors conduct random sampling every 2 hours to prevent defect accumulation.

3

FQC (Final Quality Control)

100% visual inspection and performance testing (efficiency and air resistance) on finished filters using professional testing equipment before packaging.

4

OQC (Outgoing Quality Control)

Final random inspection prior to shipment based on AQL standards, verifying packaging integrity, labeling, and overall product condition.

Self-Owned Production Line

NameQuantitySupervisor CountOperator CountQuality InspectorsProduct Category
Filter Production Line810683Air Purifier Hepa Filter / Vaccum Cleaner Hepa Filter / Vaccum Cleaner Dust Bag / Vaccum Cleaner Accessory / lorbot Kit
Injection Molding Line42122Plastic Frames / Custom Accessories / Structural Components

Main Category Capabilities

Product CategoryMax. Production CapacityShortest Sample Lead TimeAverage Lead TimeWarranty Period
Air Purifier Hepa Filter500,000 pcs / Month3-5 days15-20 days12 Months
Vaccum Cleaner Hepa Filter800,000 pcs / Month3-5 days15-20 days12 Months
Vaccum Cleaner Dust Bag1,200,0000 pcs / Month3 days15 days6 Months
Vaccum Cleaner Accessory600,000 pcs / Month5-7 days20 days12 Months
Iorbot Kit300,000 sets / Month7 days25 days12 Months

Production Machinery

Pleating Machine

Our state-of-the-art automated machinery guarantees precise pleating distances and uniform adhesive application, ensuring optimal airflow and maximum filtration efficiency for every unit.

Machine Name Automatic Pleating Machine
Brand & Model Confidential
Machine Count 4 Sets
Maintenance Weekly Calibrated

Standardized Production Flow

Production Flow

We follow a strict, standardized operational procedure. From raw material input to final sealing, every step is optimized for speed without compromising structural integrity.

Step 1: Media Slitting & Pleating
Step 2: Frame Assembly & Gluing
Step 3: Oven Curing & Sealing
Step 4: Performance Testing & Packing

Certifications & Test Reports

Our products comply with international environmental and safety standards, regularly passing rigorous third-party laboratory testing.

RoHS Test Report
RoHS Compliance Report
Material Test Report
Material Safety Test Report

Do you still have any questions for us?

Our engineering and sales team is ready to assist with quotes, lead times, custom specifications, and providing further quality documentation. Reach out today to discuss your project.

Request a Quote